ALTA Land Title Changes Taking Effect

by Michael Kreiger, P.L.S.

Surveyors

The American Land Title Association (ALTA) and the National Society of Professional Surveyors (NSPS) have recently released their final approved revisions to the ALTA Land Title Survey Standards.  These standards will become effective on February 23, 2016.

How will the new 2016 ALTA Land Title Survey Standards impact your projects?

The impact is more evolutionary than revolutionary: minor tweaks to enhance the reassurance a land title survey provides a buyer or lender.

While the 2011 standards were a major rewrite of previous standards, the 2016 version is mainly just a series of clarifications that help real estate professionals and developers better understand the information the surveys provide (and don’t provide).

For example, the new standards clearly define the surveyor’s role in researching title, property records, easements, etc., and the role of the survey purchaser in providing that information. Similarly, the new standards require that a zoning letter or report be provided to the surveyor before they can address zoning issues like zoning classification, setback requirements, height and floor space area restrictions, and parking requirements.

More significantly, the new standards clarify what a surveyor can show regarding wetlands on a Land Title Survey. The presence of wetlands can have a major impact on the way a site is developed, so it is understandably a major interest to those purchasing a property.  In the past, some have mistakenly believed that a survey which reported no observation of wetland markers indicated there were no wetlands present on the site. However, only a qualified biologist can certify that a site is free of wetlands; a surveyor merely reports the observation of wetland delineation markers.

Though this fact can be inferred from the 2011 standards, which included the location of wetlands “as delineated by appropriate authorities,” the 2016 revision is more clear-cut:

“If there has been a field delineation of wetlands conducted by a qualified specialist hired by the client, the surveyor shall locate any delineation markers observed in the process of conducting the fieldwork and show them on the face of the plat or map. If no markers were observed, the surveyor shall so state.”

Since this item is an optional item in Table A, anyone purchasing a property who is interested in the presence of wetlands on the site should hire a qualified specialist to investigate them and specifically negotiate this item into their survey contract. (Some firms, like HRG, have qualified environmental professionals on staff to provide these wetland investigations services as part of the survey.)

In some cases, the 2016 revisions ensure that the information provided in the survey documents is more accurate and complete. For example:

  • Observed utility features are now mandatory, rather than an optional item in Table A.
  • Surveyors will now merely indicate the observation of substantial areas of refuse at a site, rather than being asked to designate the site as a solid waste dump, sump or sanitary landfill. (Again, this is an optional item in Table A, so anyone requesting this information should negotiate it into their survey contract.)

When you purchase a land title survey, you are essentially purchasing peace of mind: that you clearly understand exactly what you will own and what ways you will be able to use the site once it’s purchased. The new 2016 ALTA Land Title Survey Standards enhance that peace of mind by making sure surveyors have the information they need to accurately characterize a site and that the information they provide in the final survey documents is clearly understood by the client. The revisions contained in these new standards tighten the language and remove any confusion buyers, lenders, and insurers might have had about what the survey documents show. They also ensure a uniform level of accuracy in the information the surveyors provide and the methodology they use to gather and report results.  By doing so, they strengthen the reassurance these documents offer a buyer about the likelihood of regulatory burdens, liabilities, or potential claims to the property by another party.

If you have questions about the new 2016 ALTA Land Title Survey Standards, please contact Michael Kreiger by email at mKreiger@hrg-inc.com or by phone at (717) 564-1121.


Michael Kreiger, P.L.S., Kreigerhas 23 years of experience as a surveyor, including ample experience completing ALTA Land Title Surveys for commercial and industrial properties. Other survey experience includes topographic boundary surveys, construction stakeout, and aerial ground control.

HRG is a full service consulting firm with capabilities in surveying, environmental compliance (including wetland investigations), permitting, site design, and construction inspection and administration.

Act 162 (Riparian Buffer Equivalency) May Unintentionally Hinder Developers

by: Christopher Dellinger, P.E., and Charles Suhr, Esq.

Stream

Last October, Act 162 was passed to amend Pennsylvania’s Clean Streams Law, and the land development industry rejoiced. It appeared that the requirement to provide a riparian buffer for stormwater management when developing properties adjacent to a High Quality or Exceptional Value stream was being changed to allow property owners more flexibility. This enhanced flexibility could result in the use of equally effective stormwater management techniques that would use less of the parcel, thus freeing up a greater percentage of the property for profitable use.

Now that the PA Department of Environmental Protection has begun to release its technical guidance on how the law will be applied (Implementation Plan Guidance, Riparian Buffer Equivalency Guidance, Buffer Offset Requirements Guidance], some developers and property owners are worried the legislation may, in fact, do more harm than good.

This may come as a shock to organizations like the Pennsylvania Builders Association that voiced strong support for the legislation. PBA and others in the development and construction industry felt the previous requirements of the Clean Streams Law had been too restrictive, but sometimes the devil you don’t know is more dangerous than the one you do. And, as always, the devil is in the details.

Act 162 offers other options besides riparian buffers for stormwater management in protected watersheds
Under the original law, earth disturbances were prohibited within 150 feet of rivers, streams, creeks, lakes, ponds or reservoirs in a High Quality or Exceptional Value watershed. Instead, this 150-foot-wide strip of land had to contain vegetation that helped to protect the watershed by providing shade and shelter for small creatures and filtering pollutants from stormwater runoff before it reached the special protected waters. This requirement was enforced as part of the National Pollutant Discharge Elimination System (NPDES) permitting process.

 But, setting aside a 150-foot-wide strip of land along the entire length of a protected water, could potentially result in a significant portion of a parcel being unusable (and the revenue earning potential of a site significantly decreased as a result).

Under Act 162, holders of an NPDES construction permit have greater flexibility. If their parcel contains land within 150 feet of a protected water, they can choose another stormwater Best Management Practice technique for controlling pollution as long as they can prove it is “substantially equivalent” to the buffer. Other techniques might result in a smaller loss of land than the buffer, thus increasing the economic potential of a site.

So how could this law be anything but beneficial to land developers?

Act 162 may extend protection to other water bodies not previously covered by the Clean Streams Law
The original Clean Streams Law was very careful to spell out exactly what waters required a riparian buffer; these included all high quality or exceptional value perennial or intermittent rivers, streams, or creeks, lakes, ponds or reservoirs.

Act 162 maintains the previous list of waters for determining when buffers or a substantially equivalent BMPs are required. However, in addition to requiring buffering or a substantially equivalent BMP for earth disturbance within 150-feet of the waters listed above, the law goes on to require replacement buffers (or offsetting) for any earth disturbance that occurs within 100-feet of a “surface water.” Note that this new section refers to “surface waters,” which, under current DEP regulations, is defined to include not just the waters listed above but also wetlands.

WetlandsIs it possible that development within 100 feet of wetlands within a High Quality or Exceptional Value watershed will now require replacement buffers somewhere else?

This was not the case under the previous legislation, and it could force many developers to rethink their site plans.

For example, one company developing an industrial park designed its site to maintain a 150-foot buffer from an existing high-quality stream crossing its property.  Many sections of this stream contain wetland areas adjacent to the stream.  Most of these wetlands are located within the 150-foot buffer; however, some are not.  While care was taken to avoid impacts to these wetlands, the development did propose earth disturbance close to the wetlands.  No buffers, equivalent BMPs or replacement buffers were provided because no such requirement existed at that time.  With plans for later phases still in development, the company is wondering whether it will need to provide additional buffers, equivalent BMPs, or replacement buffers now and how much square footage they may lose as a result.

The wording of Act 162 has also been interpreted by some to extend BMP requirements to all waters, not just those in High Quality or Exceptional Value watersheds.  The Chesapeake Bay Foundation of Pennsylvania, for example, submitted a letter to DEP stating:

“The plain language of Section 402(c)(1) states that ‘…persons proposing or conducting earth disturbance activities when the activity requires a National Pollutant Discharge Elimination System [(“NPDES”)] permit for storm water discharge…’ may install either a forested riparian buffer or a substantially equivalent alternative to ensure compliance with water quality standards. There is no mention of this only occurring in special protection waters. The only mention of EV/HQ watersheds, comes in Section 402(c)(2) of the law with regard to the need to ‘offset’ activities within 100 feet of a special protection water.

The failure to clearly state that buffers, or their functional equivalent, are only needed in EV/HQ watersheds where an NPDES permit is needed, while specifically mentioning the EV/HQ requirement in Section 402(c)(2), suggests a specific legal intent by the General Assembly. CBF contends that buffers or their substantial equivalent alternatives are now required wherever NPDES permits are to be issued for such activities.”

If such an approach were taken by DEP, many more parcels would be affected by this law than initially thought. Instead of allowing flexibility in design, the new law could actually create additional regulatory hurdles.

Ambiguous wording about “substantially equivalent” stormwater management techniques could cause delay in the approval process
Many questions still remain about how this law will be applied. Even the option to use “substantially equivalent” stormwater Best Management Practices in lieu of riparian buffers is quite vague. What will be accepted as “substantially equivalent”? Developers who are under pressure to build as quickly as possible do not want to spend time on ambiguity, proposing measures that may ultimately be denied. As a result, they may choose to set aside riparian buffers anyway to speed up the review process and may now need to do more than what was previously required.

Rather than opening up more land to development, the law could unintentionally restrict development even more.

Thankfully, PA DEP issued its initial technical guidance on the buffer equivalency policy and opened a public comment period to give everyone affected by the law a chance to ask questions like these. Comments were accepted until May 20, 2015.

We look forward to seeing how DEP responds to these comments and the questions Act 162 is raising.


Chris DellingerChristopher Dellinger, P.E., is the manager of HRG’s Land Development Service Group.  As such, he oversees the completion of all commercial, industrial, and residential land development projects completed by the firm throughout the Mid-Atlantic Region.  He has 17 years of experience in land development and site design, with a particular emphasis on commercial and industrial construction.

Charles SuhrCharles Suhr, Esq., is a real estate lawyer at Stevens & Lee. He represents landowners and developers in obtaining municipal approvals for residential, commercial and industrial developments and appears before local planning commissions, governing bodies and zoning hearing boards throughout south central Pennsylvania.

Turn Environmental Risk Into Reward

env-risk-into-reward-insight

Environmental risk can present an unacceptable environmental liability that will affect your bottomline whether buying, growing or selling a business or real property. Fortunately, many states provide protection from liability after specific testing and study requirements are met. To determine how you can benefit from liability protection, the first step is recognizing the three elements of environmental risk. Understanding these elements and their impact on your investment will help turn risk into reward.

All environmental risk scenarios contain the three elements of environmental risk no matter the size or complexity of your business or property. The elements are:

1.) A source of contamination (e.g., an accidental spill, a release from a gasoline tank or home heating oil tank, a history of industrial or commercial activity, etc.)

2.) A receptor(s) (e.g., workers, customers, residents, students, patients, creeks or streams, etc.)

3.) Migration pathways (e.g., does groundwater connect a source to water supply wells or streams; can people come into direct contact with contaminated soil or dust; can a source affect indoor air quality, etc.)

Once you recognize the three elements, effectively managing the risk can be as simple as removing one or a combination of these elements. In fact, existing site features like a paved parking lot or planned site improvements like the extension of public water can effectively manage risk.

Herbert, Rowland & Grubic, Inc.’s (HRG) team of licensed professional geologists and environmental scientists work alongside clients to help them navigate the liability management process. HRG’s experts can provide one or all of the following services based on your specific needs:

  • Phase I and Phase II Environmental Due Diligence
  • Pennsylvania’s voluntary Act 2 Land Recycling Cleanup Program
  • The Storage Tank Corrective Action Program
  • State and Federal Brownfield Assessment and Remediation Grant Funding

Click here to view a PDF presentation on Environmental Risk


For more information about successfully developing sites with potential environmental liabilities, please contact Jim LaRegina.

Project Fast-Tracking: Developing in the Left Lane

by: Andrew Kenworthy, P.E.

abstract acceleration motion

This article appeared in the December 27, 2007 issue of the Mid-Atlantic Real Estate Journal and is published here with their permission.

How fast do you drive down the expressway?  Do you cruise the speed limit in the right lane, or do you accelerate past the speed limit in the left lane?

In today’s fast-paced real estate market, driving the speed limit is no longer an option. You must accelerate your project through the design and approval phases quickly or risk rising costs (and lower profits).  Many changing factors pressure your projects.  Tenant requirements, practical financing and regulatory burdens are just a few.  Drive too slowly and you risk losing a tenant, acquiring a higher finance rate, or facing more stringent regulatory requirements. Put the right team behind the wheel, and you can drive your project to success, rather than end up as an accident on the 6:00 news.

In years past, developers and owners fast-tracked a project to meet the requirements of others (such as a potential tenant), but today fast-tracking is initiated by the developers and owners themselves in order to maximize their profits.  Putting your project on the fast track can be done in many ways: It could mean awarding the contract as a design-build or adding provisions to the contract that impose a penalty if the consultant doesn’t complete the project by a given deadline.  Whatever approach you take, planning and foresight are necessary to avoid potential obstacles and ensure different disciplines coordinate their work to reduce delay.  This is why having a strong team on your side is the best way to meet your goals.

By working closely from the earliest stages of project development, your team can simultaneously work on the project components to complete your project most efficiently.  Some companies work well as one member of the team, while others do well as the entire team.  If you already work with the best site entitlement company and architect, you obviously want them to work together in your best interest.  This can be very effective by utilizing different discipline experts.  Another great option is companies that provide a wide range of services under one roof.  This makes the coordination effort of each component much smoother.  Just as you get a flat tire, projects often develop issues that are unexpected.  Companies with multiple services are able to react to changing conditions quickly.  Find wetlands on a project: have the environmental group delineate and mitigate; acquire the adjoining parcel: have the survey group add it to the plan; realize a bridge is better then a culvert: have the structures group design it.  This flexibility decreases the coordination effort of identifying and contracting with separate consultants for each project component.

Before starting a project, sit down with your consultant and expect them to answer your questions honestly.  Can you get that permit by spring?  Will there be issues like zoning you can avoid by taking a different route?  Be sure to develop a relationship of trust with your consultant, and expect the same in return.

By working cohesively as a team and developing a realistic schedule that addresses all issues, you will reach your destination in the quickest timeframe.  Find a consultant that will slow down to address those issues that may truly stall your project but be aggressive in moving your project   through the approval process.  In the end, your project will be up and running like a well-oiled machine.


KennworthyAndrew Kenworthy, P.E., has extensive expertise in the areas of site planning, layout and design, zoning and regulatory requirements, permitting, stormwater management, erosion control, roadway and utility design, and bidding and construction administration. He can be reached by phone at (717) 564-1121 or by email at akenworthy@hrg-inc.com